检索范围:
排序: 展示方式:
Ai-hua Huang,Guo-tao Guo,Hai-xia Qiu
《工程管理前沿(英文)》 2015年 第2卷 第1期 页码 31-34 doi: 10.15302/J-FEM-2015005
关键词: personal-organizational values fit job involvement perceived organizational support new generation of employees
Perceived resource support for chronic illnesses among diabetics in north-western China
null
《医学前沿(英文)》 2016年 第10卷 第2期 页码 219-227 doi: 10.1007/s11684-016-0441-3
A high level of social support can improve long-term diabetes self-management. Support from a single source has been evaluated. This study aims to analyze support from multiple and multilevel sources for diabetic patients by using the Chronic Illness Resources Survey (CIRS). Factors influencing the utilization of the CIRS were also evaluated. A total of 297 patients with diabetes were investigated using the CIRS and Perceived Diabetes Self-management Scale in Shihezi City, China. Descriptive statistics were used to explain demographic variables and scores of the scales. Factors affecting the utilization of chronic illness resources were determined through univariate analysis and then examined by multivariate logistic regression analysis. Of the 297 diabetic patients surveyed, 67% failed to reach the standard (more than 3 points) of utilizing chronic illness resources. Moreover, utilization of chronic illness resources was positively moderately correlated with self-management of diabetes (r = 0.75, P <0.05). According to the multivariate logistic regression analysis, age (OR, 3.42; 95%CI, 1.19–9.84) and monthly income (OR, 5.27; 95%CI, 1.86–14.90) were significantly positively associated with the CIRS score. Individuals with high school (OR, 2.61; 95%CI, 1.13–6.05) and college (OR, 3.02; 95%CI, 1.13–8.04) degrees obtained higher scores in the survey than those with elementary school education. Results indicated that utilization of resources and support for chronic illness self-management, particularly personal adjustment and organization, were not ideal among diabetics in the communities of north-western China. Improved utilization of chronic illness resources was conducive for proper diabetes self-management. Furthermore, the level of utilization of chronic illness resources increased with age, literacy level, and monthly income.
关键词: chronic illness resources survey diabetes community north-western China
《农业科学与工程前沿(英文)》 2023年 第10卷 第1期 页码 135-148 doi: 10.15302/J-FASE-2022464
● The choice of a modern agriculture project was found to be rational for professional farmers to reduce interference from non-market factors. The success of this project is due to its capacity to successfully fill the structural hole in the market transaction network.
关键词: Benefit-linked mechanism featured agriculture organizational integration professional farmers rural cooperative structural hole theory
《工程管理前沿(英文)》 页码 439-454 doi: 10.1007/s42524-022-0211-7
关键词: megaproject organizational evolution whole lifecycle management project management team
The psychology of organizational and social sustainability
Wei-Tau LEE, Hao ZHANG, Kenneth H. FUNK II
《工程管理前沿(英文)》 2019年 第6卷 第3期 页码 336-350 doi: 10.1007/s42524-019-0029-0
关键词: work design work dimensions psychological factors good work
Sander SIEBELINK, Hans VOORDIJK, Maaike ENDEDIJK, Arjen ADRIAANSE
《工程管理前沿(英文)》 2021年 第8卷 第2期 页码 236-257 doi: 10.1007/s42524-019-0088-2
关键词: building information modeling implementation barriers maturity organizational levels
祝 泓,张 平
《中国工程科学》 2015年 第17卷 第5期 页码 44-50
本文在分析国外综合保障系统的基础上,提出了适用于我国舰船的保障系统顶层设计方案,给出了系统组成、主要功能和主要技术指标,将综合保障系统划分为保障资源系统、装备综合保障管理信息系统、装备故障诊断与健康管理系统三个分系统,并对各分系统的系统功能和组成进行了阐述,为舰船装备开展综合保障系统集成和管理提供了参考。
Socialized care services for the aged population: System construction and support measures
《工程管理前沿(英文)》 2023年 第10卷 第2期 页码 339-353 doi: 10.1007/s42524-022-0208-2
关键词: socialized care service for the elderly system construction support measure
Causations of failure in megaprojects: A case study of the Ajaokuta Steel Plant project
Oluwole Alfred OLATUNJI
《工程管理前沿(英文)》 2018年 第5卷 第3期 页码 334-346 doi: 10.15302/J-FEM-2018011
This paper uses project organizational theories to draw lessons from a historic megaproject, the Ajaokuta Steel Plant (ASP). Archival reports on the ASP were explored to identify the unique attributes of the project; the political wrangling that underplayed its evolution, its economic significance and organizational impacts. Findings suggest the goals of the ASP project were, and still are, unambiguous. Failure occurred as socio-political forces aggravated the project’s complex milestones. Stakeholders were impatient with pre-project investigations. During planning, owners ignored opinions that were contrary to their expectations. While delays lingered, pressures from the global economy weakened the project’s motivation to succeed. These combined to turn the project’s outcomes into a chaotic situation that triggered dire implications. Despite about 1400% overrun in cost, the success achieved on the plant was 28% at commissioning. Contractors remained on site until eight years after commissioning. Six key elements of the 482 items in the ASP project contract were not delivered nearly 40 years on. A simplistic look at these suggests poor planning is the main problem. However, planning issues is not entirely strange in greenfield projects. The paper draws strength from project organization theories to explain what was poor about the planning. Socrates’ generic management theory was used to explain the role of leadership in the failure of the ASP project. McGregor’s Theory X and Theory Y explain the significance of stakeholders’ integration in megaprojects. Systems and chaos theories were used to explain the sensitivity of the ASP project to uncertainties. Narratives on these combine well to inspire stakeholders of megaprojects on where and how to seek courage in making effective plans that can help achieve success in complex projects. While normative literature only recognizes project success in a definitive perspective, this study provides insights from failure as an instrument to trigger sublime reflections.
关键词: industrial projects megaprojects Nigeria project organizational theories steel plant
Inheritance and Innovation of Engineering Management Informatization
Kai Sun,Ren-huai Liu
《工程管理前沿(英文)》 2014年 第1卷 第1期 页码 76-82 doi: 10.15302/J-FEM-2014014
关键词: engineering management informatization inter-organizational relationship management creation resource sharing
BMP decision support system for evaluating stormwater management alternatives
Mow-Soung CHENG, Jenny X. ZHEN, Leslie SHOEMAKER,
《环境科学与工程前沿(英文)》 2009年 第3卷 第4期 页码 453-463 doi: 10.1007/s11783-009-0153-x
关键词: best management practices decision support system low impact development geographic information system optimization
Liquefaction prediction using support vector machine model based on cone penetration data
Pijush SAMUI
《结构与土木工程前沿(英文)》 2013年 第7卷 第1期 页码 72-82 doi: 10.1007/s11709-013-0185-y
关键词: earthquake cone penetration test liquefaction support vector machine (SVM) prediction
Current applications of artificial intelligence for intraoperative decision support in surgery
Allison J. Navarrete-Welton, Daniel A. Hashimoto
《医学前沿(英文)》 2020年 第14卷 第4期 页码 369-381 doi: 10.1007/s11684-020-0784-7
关键词: artificial intelligence decision support clinical decision support systems intraoperative deep learning computer vision machine learning surgery
《结构与土木工程前沿(英文)》 页码 1086-1099 doi: 10.1007/s11709-023-0976-8
梁志成,于跃海,仲伟俊
《中国工程科学》 2010年 第12卷 第1期 页码 74-80
介绍了创造力支持系统发展历程、创造力与创造性思维,综合研究了各类创造力支持系统,给出了创造力支持系统的构成要素、体系结构,并以构建系统用于电力系统故障分析实例研究,阐述了创造力支持系统对专家思维的支持过程。为创造力支持系统开发实现与应用提供参考。
标题 作者 时间 类型 操作
Research on the Relationship between Personal-Organizational Values Fit and Job Involvement of the New
Ai-hua Huang,Guo-tao Guo,Hai-xia Qiu
期刊论文
ENTREPRENEURIAL OPPORTUNITY, VALUE EVOLUTION, AND ORGANIZATIONAL INTEGRATION OF PROFESSIONAL FARMER ENTREPRENEURSHIP
期刊论文
Organizational evolution of project management teams over the whole lifecycle of megaprojects: Case study
期刊论文
The psychology of organizational and social sustainability
Wei-Tau LEE, Hao ZHANG, Kenneth H. FUNK II
期刊论文
Understanding barriers to BIM implementation: Their impact across organizational levels in relation to
Sander SIEBELINK, Hans VOORDIJK, Maaike ENDEDIJK, Arjen ADRIAANSE
期刊论文
Causations of failure in megaprojects: A case study of the Ajaokuta Steel Plant project
Oluwole Alfred OLATUNJI
期刊论文
BMP decision support system for evaluating stormwater management alternatives
Mow-Soung CHENG, Jenny X. ZHEN, Leslie SHOEMAKER,
期刊论文
Liquefaction prediction using support vector machine model based on cone penetration data
Pijush SAMUI
期刊论文
Current applications of artificial intelligence for intraoperative decision support in surgery
Allison J. Navarrete-Welton, Daniel A. Hashimoto
期刊论文
Reliability-based design optimization of offshore wind turbine support structures using RBF surrogate
期刊论文